Delivered Turnkey Bitcoin Mining Infrastructure & Facilities

End-to-end engineering, advanced cooling infrastructure, and turnkey power deployment for utility-scale mining operations worldwide.

DELIVERED CASE STUDIES

Project Portfolio

Browse our portfolio of delivered infrastructure projects across advanced cooling, power systems, containerized mining, and turnkey deployment solutions.

Texas, United States 3MW–30MW+ Large
Five 308-Slot Bitmain ANTSPACE HD5 Containers in Texas
Power Capacity 7.5MW
Status Operational
Phoenix, Arizona 3MW–30MW+ Large
Twelve 308-Slot Bitmain ANTSPACE HD5 Containers Operating in Phoenix
Power Capacity 18MW
Status Operational
Dallas, United States 3MW–30MW+ Large
240-Slot Avalon 2U Hydro Container Deployed in Dallas
Power Capacity 4.8MW
Status Operational
Quebec, Canada 150kW–3MW Industrial
160-Slot Avalon 2U Hydro Container Deployed in Quebec
Power Capacity 1.6MW
Status Completed
Raleigh, North Carolina 3MW–30MW+ Large
Three 160-Slot Avalon Containers Balancing Grid Power in Raleigh
Power Capacity 4.8MW
Status Operational
Norway 3MW–30MW+ Large
Six 120-Slot Avalon Hydro Containers Tied to Oslo District Heating
Power Capacity 7.2 MW
Status Completed
Canada 150kW–3MW Industrial
Two 120-Slot Avalon Containers Heat a Manitoba Greenhouse
Power Capacity 2.4MW
Status Completed
Southeast Asia 150kW–3MW Industrial
1MW Indoor Expansion: Five 20-Slot Avalon Racks in Southeast Asia
Power Capacity 1MW
Status Completed
Oman 150kW–3MW Industrial
Two 20-Slot Avalon Hydro Cooling Racks Deployed in Muscat
Power Capacity 400kW
Status Operational
Sweden 3MW–30MW+ Large
Eight 100-Slot Avalon Hydro Containers Energized in Stockholm
Power Capacity 8MW
Status Operational
Oman 3MW–30MW+ Large
Three 100-Slot Avalon Hydro Containers Deployed in Muscat
Power Capacity 3MW
Status Operational
Novosibirsk, Russia 3MW–30MW+ Large
Six 240-Slot Whatsminer Liquid Cooling Containers in Austin
Power Capacity 14.4MW
Status Operational
Tashkent, Uzbekistan 3MW–30MW+ Large
Powering 2,400 Whatsminer Rigs Across 10 Containers in Tashkent
Power Capacity 24MW
Status Completed
Stavanger, Norway 3MW–30MW+ Large
Deploying 10 Whatsminer Hydro Containers on River Runoff in Stavanger
Power Capacity 12MW
Status Completed
Dallas, United States 3MW–30MW+ Large
5-Unit 120-Slot Whatsminer Hydro Container Array in Dallas
Power Capacity 6MW
Status Operational
Charlotte, United States 3MW–30MW+ Large
8-Unit 10MW Antminer 3U Hydro Cluster in Charlotte
Power Capacity 10MW
Status Operational
Charlotte, United States 3MW–30MW+ Large
Five 104-Slot Antminer 3U Hydro Containers in Frankfurt
Power Capacity 6.25MW
Status Completed
Salt Lake City, United States 10kW–150kW Small
48kW Bitmain ANTRACK Home Heating in Salt Lake City
Power Capacity 48kW
Status Operational
Zurich, Switzerland 10kW–150kW Small
96kW Bitmain ANTRACK Workshop Heating in Zurich
Power Capacity 96 kW
Status Operational
Texas, United States 10kW–150kW Small
Silent 70kW Antminer Hydro Cooling Rack Garage Cluster in Texas
Power Capacity 420kW
Status Completed
Vancouver, Canada 10kW–150kW Small
12-Slot Antminer Water Cooler Basement Project in Vancouver
Power Capacity 70kW
Status Operational
Bavaria, Germany 150kW–3MW Industrial
500kW Antminer Water Cooler Garage Cluster in Bavaria
Power Capacity 500kW
Status Completed
Oslo, Norway 10kW–150kW Small
9-Slot Antminer Water Cooler Oslo Home Heating Project
Power Capacity 50kW
Status Completed
Helsinki, Finland 150kW–3MW Industrial
35kW Antminer Water Cooler Garage Heating in Helsinki
Power Capacity 245kW
Status Completed
Berlin, Germany 10kW–150kW Small
6-Slot Antminer Home Water Cooler in a Berlin Apartment
Power Capacity 35kW
Status Completed
Seoul, South Korea 150kW–3MW Industrial
15-Unit Antminer Water Cooler Testing Lab in Seoul
Power Capacity 390kW
Status Completed
London, United Kingdom 10kW–150kW Small
4-Slot Antminer Water Cooler Home Deployment in London
Power Capacity 26kW
Status Completed
Almaty, Kazakhstan 150kW–3MW Industrial
Central Tower Powers Four 36-Slot Hydro Cabinets in Almaty
Power Capacity 800kW
Status Operational
Abu Dhabi, UAE 150kW–3MW Industrial
1-to-1 Dry Cooler Setup: 36-Slot Antminer Hydro Cooling Cabinet in Abu Dhabi
Power Capacity 196kW
Status Completed
Southeast Asia 150kW–3MW Industrial
1-to-9 Setup: 28-Slot Antminer Hydro Cabinet in Southeast Asia
Power Capacity 1.4MW
Status Operational
Texas, United States 150kW–3MW Industrial
1-to-7 Setup: 28-Slot Modular Liquid Cooling Cabinet in Texas
Power Capacity 1MW
Status Completed
Tbilisi, Georgia 150kW–3MW Industrial
1-to-5 Setup: 24-Slot Antminer Hydro Cabinet in Tbilisi
Power Capacity 660kW
Status Completed
Oregon, United States 150kW–3MW Industrial
Matching 800kW Power: 24-Slot Liquid Cooling Cabinet Setup
Power Capacity 800kW
Status Operational
Utah, United States 150kW–3MW Industrial
1-to-6 Setup: 20-Slot Hydro Mining Cabinet in Utah
Power Capacity 660kW
Status Completed
Asunción, Paraguay 150kW–3MW Industrial
1-to-3 20-Slot Antminer Water Cooling Cabinet Setup in Asunción
Power Capacity 330kW
Status Completed
Stockholm, Sweden 150kW–3MW Industrial
36-Slot Antminer Hydro Cooling Rack Project in Stockholm
Power Capacity 600kW
Status Operational
Hamburg, Germany 3MW–30MW+ Large
36-Slot Hydro Cooling Cabinet Solar Farm in Hamburg
Power Capacity 3.2MW
Status Completed
Texas, United States 150kW–3MW Industrial
210-Slot Bitmain ANTSPACE HW5 Container Project in Texas
Power Capacity 24MW
Status Operational
Alto Paraná 150kW–3MW Industrial
210-Slot ANTSPACE HW5 Hydro Container Project in Alto Paraná
Power Capacity 14.4MW
Status Operational
Texas, United States 10kW–150kW Small
240-Slot Hydro Bitcoin Mining Farm Across Rural Texas
Power Capacity 16.8MW
Status Operational
Ohio, United States 10kW–150kW Small
240-Slot 20ft Hydro Mining Container Project in Ohio
Power Capacity 5.6MW
Status Operational
Ekibastuz, Kazakhstan 10kW–150kW Small
480-Slot Utility-Scale Hydro Bitcoin Mining Project in Ekibastuz
Power Capacity 26.4MW
Status Completed
Monterrey, Mexico 3MW–30MW+ Large
480-Slot Industrial Hydro Bitcoin Mining Installation in Monterrey
Power Capacity 31.68MW
Status Completed
Luleå, Sweden 3MW–30MW+ Large
420-Slot Bitcoin Mining Hydro Container Project in Sweden
Power Capacity 19.2MW
Status Operational
Atlanta, United States 3MW–30MW+ Large
420-Slot Turnkey Bitcoin Mining Container Buildout in Atlanta
Power Capacity 28.8MW
Status Operational
Reykjavik, Iceland 3MW–30MW+ Large
420-Slot ASIC Liquid Cooling Container Project in Reykjavik
Power Capacity 12MW
Status Operational
Edmonton, Canada 3MW–30MW+ Large
420-Slot Modular Bitcoin Mining Container Facility in Edmonton
Power Capacity 28.8MW
Status Operational
Addis Ababa, Ethiopi 3MW–30MW+ Large
25.2MW Turnkey Bitcoin Mining Infrastructure in Addis Ababa, Ethiopi
Power Capacity 25.2MW
Status Operational
Dubai, UAE 3MW–30MW+ Large
Scaling 10 x 2.1MW 364-Slot Antminer Hydro Containers in Dubai
Power Capacity 21MW
Status Operational
Tashkent, Uzbekistan 3MW–30MW+ Large
25.5MW Water-Cooled Bitcoin Mining Facility in Tashkent, Uzbekistan
Power Capacity 25.5MW
Status Completed
Atlanta, Georgia 3MW–30MW+ Large
308-Slot Hydro Cooling Container Deployment in Atlanta, Georgia
Power Capacity 10.2MW
Status Operational
Santiago, Chile 3MW–30MW+ Large
12MW Liquid Cooling Bitcoin Mining Deployment in Santiago, Chile
Power Capacity 12MW
Status Operational
Austin, Texas 3MW–30MW+ Large
4.8MW Integrated Hydro Mining Container Deployment in Austin, Texas
Power Capacity 4.8MW
Status Completed
Calgary, Canada 3MW–30MW+ Large
Sub-Zero Hydro Bitcoin Mining: 8 x 1.2MW Deployment in Calgary, Canada
Power Capacity 9.6MW
Status Completed
Abu Dhabi, UAE 3MW–30MW+ Large
14.4MW Hydro Bitcoin Mining Facility in Abu Dhabi Desert
Power Capacity 14.4MW
Status Completed
CASE STUDY HIGHLIGHT

110+ MW Hydro Mining Infrastructure Project

Location

Ethiopia

Project Overview

In Ethiopia, Apexto delivered over 110 MW of utility-scale hydro cooling infrastructure, hosting a massive mixed fleet of more than 16,000 Antminer (S19, S21, 3U) and WhatsMiner (2U) hydro miners.

To support diverse hardware, Apexto supplied 49 custom containers (1.2MW to 2.4MW) with tailored slot configurations. Apexto provided full turnkey execution, managing everything from equipment manufacturing and global logistics to on-site installation and final commissioning.

Capacity

110+ MW

Deployment

Containerized

Cooling Method

Hydro Cooling

Status

Completed

Completion Time

2025

GLOBAL FOOTPRINT

Completed Projects Worldwide

Delivering reliable mining infrastructure solutions across strategic markets across the globe.

Ready to Build Your Mining Farm?

Share your power parameters and basic project details. Our engineering team will review your case and get in touch quickly to discuss your power layout, cooling plan, and budget estimate.